Aerial view of the marina basin and boat docks Cabrillo's docks are concrete floating docks from Bellingham Marine

Cabrillo Way Marina

Project Details:

City: San Pedro
Country: USA
Start Date: 06/08/2009
Completion Date: 11/30/2011
Scope of Work: Supply and Install
Website: View Website

Bellingham’s scope of work included everything from the top of the gangway down. Bellingham supplied and oversaw the installation the docks and all electrical and mechanical systems. The new marina features Bellingham's Unifloat system with water, power, telephone and television hook ups. The average slip size is 46’; slips lengths range from 28’ to 130’ and utilize single piece fingers up to 50’.