The new concrete pontoons at Derwent were designed and manufactured by Bellingham Marine An aerial view of Derwent Sailing Squadron shows the club's new pontoon and floating wave attenuator

Derwent Sailing Squadron

Project Details:

City: Hobart
Country: Australia
Start Date: 07/20/2015
Completion Date: 11/13/2015
Scope of Work: Design /Build
Website: View Website

Derwent Sailing Squadron expanded their facility to more than double the marina’s capacity. Bellingham Marine was awarded a contract to add 140 berths to the marina’s existing 130 berths.  Bellingham was also responsible for the design and construction of the club's floating wave attenuator, which was added to protect the new berths and to make way for future expansion. 

The berths feature Bellingham Marine’s Unifloat concrete pontoon system.