The concrete floating docks at the two marinas are finished with a raven color A teak gangway greets boaters as they walk onto the marina's docks

Rose Bay and Point Piper Marinas

Project Details:

City: Sydney
Country: Australia
Start Date: 01/21/2010
Completion Date: 02/08/2012
Scope of Work: Design/Build
Website: View Website

The two new marinas were design-built by Bellingham Marine Australia (BMA). Piper Point Marina berth sizes range from 10 to 30 meters and Rose Bay berths are from 15 to 30 meters. The marinas accommodate classes of boats from medium scale to super yachts. Pontoons have 650 mm of freeboard except for the larger berths where the freeboard is 750mm and more suitable for 30m yachts.

The project includes 83 berths in two marinas. The BMA concrete pontoons have a “raven colored” additive that creates a charcoal appearance. The marina includes black fendering and pilings with black sleeves topped with black pile caps with a white horizontal accent stripes. To keep an unobstructed view, some of the pilings are telescoping and remain hidden beneath the deck at all times.