The marina gangway at this marina features a unique tipped a handrail The marina's concrete docks featured an Ashlar's pattern The marina's custom gates and handrail complement the the upland buildings

The Harbor at Marina Bay

Project Details:

City: Marina del Rey
Country: USA
Start Date: 07/25/2012
Completion Date: 07/01/2013
Scope of Work: Design/Build, General Contractor
Website: View Website

Bellingham Marine was hired as the design/build general contractor to replace the existing marina system at the Harbor at Marina Bay with a new, modern, low-maintenance concrete dock system. The renovation included upgraded utility services and a high end dock system with a colored stamped deck and rounded finger ends.

Bellingham provided a complete turn-key package. Upon completion, The Harbor at Marina Bay included the latest in dockside amenities and provided the best in modern boat moorage. The marina accommodates 207 boats in single berth slips and 11 vessels on side-ties. Slips range in length from 22’ to 60’ and side-ties up to 90'.