Project overview
St. Paul Harbor lies in the Central Bering Sea off the west coast of Alaska, a region known for rough water and brutal winters. Bellingham Marine worked with general contractor Dutra Dredging and the Central Bering Sea Fishermen’s Association on a turn-key design/build small boat harbor for the local fishing fleet.
- Scope: final design, fabrication and installation of a prestressed/precast concrete launch ramp, launch float, precast abutments, gangways, anchor systems and marina floats.
- Everything was prefabricated and shipped by barge, as there were no local materials.
- The whole system, including piling, is designed to be removed and stored upland each winter.
- Heavy-duty floats of galvanized I-beams and tube-steel truss frames with glu-lam walers, polyethylene-encased flotation, an 8-inch steel bull rail and steel grating decks.
Read the full story: BELLINGHAM MARINE DESIGNS FLOAT SYSTEM FOR ST. PAUL’S EXTREME SITE.