Waikawa Marina

Description

Bellingham Marine New Zealand were contracted in late 2020 to extend the north face of the Waikawa Marina in the stunning Marlborough Sounds, providing 251 brand-new berths. With 227 piles to be installed with the addition of manufacturing and installation of 401 pontoons, this was an exciting time for the  team and a challenging time ahead.  

Project overview

Bellingham Marine New Zealand was contracted in late 2020 to extend the north face of Waikawa Marina in the Marlborough Sounds, adding 251 new berths for Port Marlborough.

  • 227 piles and 401 pontoons manufactured and installed.
  • The marina was pre-piled while the outer breakwater was still being built, using GPS set-out instead of piling through the pontoon rings – no pile guides or layouts needed changing.
  • Unifloat® pontoons with aluminium connections and internal fibreglass rebar, removing galvanised steel and steel rebar to extend life and cut maintenance.
  • The final pontoon was delivered in January 2023.

Read the full story: How Bellingham Marine Maximised Innovation when it Built the Extension at Waikawa Marina.

Features

Specialized Unifloat® pontoons with aluminum connections

Elimination of galvanized steel components

Internal fiberglass rebar

251 new berths