Description

Located in front of the recently renovated historic Marina del Rey Hotel, Marina del Rey Marina is in the heart of Marina del Rey. A trendsetter in the industry, MDR Marina is the first U.S. marina to be outfitted completely with fiber reinforced polymer, or FRP walers and thru-rods.

The marina’s innovative FRP components require minimal maintenance, have a long service life and will not rust or decay.

Project overview

Marina del Rey Marina wraps around a peninsula next to the historic Marina del Rey Hotel in Marina del Rey Harbor, California – America’s largest man-made harbor. Its rebuild began in 2014 and was completed in seven phases, the last finishing in May 2020.

  • The 349-slip layout was redesigned into 277 slips with thirteen end ties from 35 to 65 feet.
  • Bellingham Marine concrete floating docks with the first-ever US use of FRP (fiberglass reinforced polymer) walers and thru-rods.
  • FRP walers resist rust and decay, need less maintenance and give the docks a longer service life.

Read more: Bellingham Marine Brings a Landmark into the 21st Century.

Features

Unifloat concrete docks

FRP walers

FRP thru-rods

Concrete imprinted junction box lids